In a joint effort between the Municipality of Concordia and the Argentine Delegation to the Mixed Technical Commission of Salto Grande (CTM), the operation of the Osvaldo Magnasco Water Cooperative was restored this morning.
A 50KW generator set provided by CTM was connected to the main pumping system panel, with its corresponding protections.
In this way, and while work continues to restore the electrical power system, local residents will be able to have normalized drinking water service in the coming hours.
On the other hand, also in a coordinated manner and with the collaboration of CTM, the removal of a large tree that fell during the storm in the Pampa Soler neighborhood was carried out.
A 50KW generator set provided by CTM was connected to the main pumping system panel, with its corresponding protections.
In this way, and while work continues to restore the electrical power system, local residents will be able to have normalized drinking water service in the coming hours.
On the other hand, also in a coordinated manner and with the collaboration of CTM, the removal of a large tree that fell during the storm in the Pampa Soler neighborhood was carried out.
