The Municipality of Concordia, through the Secretariat of Urban Development, continues this Thursday, August 29, with the program for the repair of unpaved streets as well as pothole patching in different sectors and neighborhoods of the city.
The sectors where work will be carried out during the day are as follows:
Constitución Neighborhood: Profiling of Larocca and Osuna streets, between Córdoba and J.J. Valle; 53rd Street, between Sauré and J.J. Valle.
Tavella Norte Neighborhood: Repair of Brown Street, between Mega and Mario Gatto. Then Mario Gatto, between Próspero Bovino and Gobernador Cresto.
Profiling and repair of Cabo Miño streets, between Sauré and Yamandú Rodríguez; maintenance on Paula Albarracín, between España and Boulevard Ayuí.
Profiling of Boulevard Yuquerí, between Dr. Solari and the railway tracks.
San Agustín Neighborhood: Graveling of Belgrano Street, between Batalla de Cepeda and República del Brasil.
Concrete pouring on Gobernador Cresto streets, between Dr. Sauré and Crisóstomo Gómez; Gobernador Cresto, near Presidente Illia; Boulevard Robinson near Espino; Presbítero del Castillo and Espino.
Hot asphalt pouring on 1º de Mayo streets, between the railway tracks and Bolivia; Mitre, between Lamadrid and Bolivia; Concejal Veiga, past Ricardo Rojas and Federación, between Ricardo Rojas and Dr. Del Cerro.
Curb and gutter: Molding of the drainage dip at Cortina and San Juan streets.
The sectors where work will be carried out during the day are as follows:
Constitución Neighborhood: Profiling of Larocca and Osuna streets, between Córdoba and J.J. Valle; 53rd Street, between Sauré and J.J. Valle.
Tavella Norte Neighborhood: Repair of Brown Street, between Mega and Mario Gatto. Then Mario Gatto, between Próspero Bovino and Gobernador Cresto.
Profiling and repair of Cabo Miño streets, between Sauré and Yamandú Rodríguez; maintenance on Paula Albarracín, between España and Boulevard Ayuí.
Profiling of Boulevard Yuquerí, between Dr. Solari and the railway tracks.
San Agustín Neighborhood: Graveling of Belgrano Street, between Batalla de Cepeda and República del Brasil.
Concrete pouring on Gobernador Cresto streets, between Dr. Sauré and Crisóstomo Gómez; Gobernador Cresto, near Presidente Illia; Boulevard Robinson near Espino; Presbítero del Castillo and Espino.
Hot asphalt pouring on 1º de Mayo streets, between the railway tracks and Bolivia; Mitre, between Lamadrid and Bolivia; Concejal Veiga, past Ricardo Rojas and Federación, between Ricardo Rojas and Dr. Del Cerro.
Curb and gutter: Molding of the drainage dip at Cortina and San Juan streets.
