The Municipality of Concordia, through the Secretariat of Urban Development, continues this Monday, August 12, with the program for the repair of unpaved streets, as well as pothole patching and drain cleaning in different sectors and neighborhoods of the city.
The sectors where work will be carried out during the day are as follows:
Victorino Simón Neighborhood: Profiling of Laprida street, between Dr. Sauré and Lieberman; then, JJ. Valle, between Tavella and Próspero Bovino.
María Goretti Neighborhood: Profiling and repair of Felipe Heras street, between Pellegrini and Entre Ríos.
Villa Adela Neighborhood: Profiling of Castagnini street up to Route 14.
Tavella Norte Neighborhood: Continued repair of Padres Capuchinos street, between Próspero Bovino and Eva Perón.
Itatí Neighborhood: Repair of Humberto Primo street, between Dr. Florenza and Gregoria Pérez. Then Chile street between Dr. Florenza and Gregoria Pérez.
San Agustín Neighborhood: Continued graveling of Rocamora street, between Misiones and Maipú.
Pancho Ramírez Neighborhood: Public Street, between Odiard and Rivoli and between Córdoba and Alda.
Concrete work on Castelli and 25 de Mayo streets; Aristóbulo del Valle at the 400 block; La Pampa and República del Paraguay.
Opening and compaction of potholes on Sargento Cabral and Perú streets; Pirovano and Chile; Perú and Avellaneda; Castelli, between 25 de Mayo and Sarmiento; Castelli and Entre Ríos; 25 de Mayo, between San Martín and Aristóbulo del Valle; Laprida and Las Heras.
Curb and gutter: Molding on La Rioja street, between Poenitz and Arruabarrena.
Excavation on La Rioja, between Arruabarrena and Manuel Cortina.
The sectors where work will be carried out during the day are as follows:
Victorino Simón Neighborhood: Profiling of Laprida street, between Dr. Sauré and Lieberman; then, JJ. Valle, between Tavella and Próspero Bovino.
María Goretti Neighborhood: Profiling and repair of Felipe Heras street, between Pellegrini and Entre Ríos.
Villa Adela Neighborhood: Profiling of Castagnini street up to Route 14.
Tavella Norte Neighborhood: Continued repair of Padres Capuchinos street, between Próspero Bovino and Eva Perón.
Itatí Neighborhood: Repair of Humberto Primo street, between Dr. Florenza and Gregoria Pérez. Then Chile street between Dr. Florenza and Gregoria Pérez.
San Agustín Neighborhood: Continued graveling of Rocamora street, between Misiones and Maipú.
Pancho Ramírez Neighborhood: Public Street, between Odiard and Rivoli and between Córdoba and Alda.
Concrete work on Castelli and 25 de Mayo streets; Aristóbulo del Valle at the 400 block; La Pampa and República del Paraguay.
Opening and compaction of potholes on Sargento Cabral and Perú streets; Pirovano and Chile; Perú and Avellaneda; Castelli, between 25 de Mayo and Sarmiento; Castelli and Entre Ríos; 25 de Mayo, between San Martín and Aristóbulo del Valle; Laprida and Las Heras.
Curb and gutter: Molding on La Rioja street, between Poenitz and Arruabarrena.
Excavation on La Rioja, between Arruabarrena and Manuel Cortina.