The Municipality of Concordia, through the Secretariat of Urban Development, continues today, Tuesday, May 28, with the program for the repair of unpaved streets, as well as pothole patching and drain cleaning in different sectors and neighborhoods of the city.
The sectors where work will be carried out during the day are as follows:
Río Uruguay Neighborhood: Profiling and repair of 6 de Caballería, Echagüe, Néstor Garat, and other streets.
San Agustín Neighborhood: Repair of Misiones street, between Antonio de Luque and San Lorenzo.
La Bianca Neighborhood: Repair of Jujuy street, between Eva Perón and Hipólito Yrigoyen.
I.A.P.V. Neighborhood: Profiling and repair of Odiard, Moulins, Gregoria Pérez, Antonio Báez, Vera Peñaloza, and Ricardo Rojas streets.
Laprida street, between Ayuí and Italia: Profiling and repair. Also Los Viñedos from Laprida to Eva Perón.
Cipo Neighborhood: Repair of Ituzaingó street, between J.J. Valle and the tracks; Yamandú Rodríguez between Tavella and Ituzaingó.
Villa Zorraquín, Gualeguay street: Cleaning of ditching debris
Pothole opening in asphalt: Alvear at the 400 block; Antonio de Luque and Gobernador Cresto.
Concrete pouring at: Las Heras and Diamante; Laprida and 11 de Noviembre; Italia near Laprida; Balcarce and Alvear; Quintana and Ituzaingó.
Pothole opening between: Perú and Sargento Cabral; Avellaneda between Perú and Chile; Avellaneda between Chile and Humberto Primo; Chile and Sargento Cabral.
Joint sealing at: Belgrano and Rotonda de la Mujer; Belgrano, on Parque San Carlos.
The sectors where work will be carried out during the day are as follows:
Río Uruguay Neighborhood: Profiling and repair of 6 de Caballería, Echagüe, Néstor Garat, and other streets.
San Agustín Neighborhood: Repair of Misiones street, between Antonio de Luque and San Lorenzo.
La Bianca Neighborhood: Repair of Jujuy street, between Eva Perón and Hipólito Yrigoyen.
I.A.P.V. Neighborhood: Profiling and repair of Odiard, Moulins, Gregoria Pérez, Antonio Báez, Vera Peñaloza, and Ricardo Rojas streets.
Laprida street, between Ayuí and Italia: Profiling and repair. Also Los Viñedos from Laprida to Eva Perón.
Cipo Neighborhood: Repair of Ituzaingó street, between J.J. Valle and the tracks; Yamandú Rodríguez between Tavella and Ituzaingó.
Villa Zorraquín, Gualeguay street: Cleaning of ditching debris
Pothole opening in asphalt: Alvear at the 400 block; Antonio de Luque and Gobernador Cresto.
Concrete pouring at: Las Heras and Diamante; Laprida and 11 de Noviembre; Italia near Laprida; Balcarce and Alvear; Quintana and Ituzaingó.
Pothole opening between: Perú and Sargento Cabral; Avellaneda between Perú and Chile; Avellaneda between Chile and Humberto Primo; Chile and Sargento Cabral.
Joint sealing at: Belgrano and Rotonda de la Mujer; Belgrano, on Parque San Carlos.
